Key issues

Six reasons this fight continues

Each issue is unresolved. Each has its own record, its own decision-makers, and its own way for you to help.
01 · Traffic and emergency access

One road in. One road out. ~624 homes.

The property sits between established neighborhoods served by narrow roads never designed for a high-density development’s daily trips — or for years of heavy construction traffic. A prior draft agreement called Gregory Lane “emergency use only” while opening it to construction traffic for up to 48 months. It was never approved.

  • The conditionally approved plat shows only one point of access. The County accepts this by treating the plat as all single-family with sprinklers in every home; the Fire Marshal confirmed buildings with four or more dwelling units would trigger a two-entrance requirement. The developer’s own Traffic Impact Analysis evaluated 309 multifamily units in 11 buildings. Our position: 600+ homes need two entrances regardless of sprinklers.
  • Residents’ review of the May 2026 Traffic Impact Analysis identified serious problems: it assumes students attend Hunt Elementary when the site is zoned for Hickey Elementary over 4 miles away (confirmed with PISD); it relies on traffic data ending in 2022 with a generic 5% growth rate; it omits developments already underway nearby; and it does not fully reflect the completion of Hogge/Murphy/FM 2551. The TIA’s own “existing lane conditions” exhibit also shows a street connecting the development to Gregory Lane.
  • A TxDOT driveway permit remains an unmet plat condition, and roadway approvals remain open. Residents have documented discrepancies between plat versions shown to the City and to the County.

Help: report near-misses, congestion, and road damage through the Action Center so they become part of the record.

02 · Flooding and drainage

More pavement upstream means more water downstream

Replacing open land with rooftops and pavement increases stormwater runoff. Runoff affects Maxwell Creek, Dublin Creek, and Cottonwood Creek. Upstream and downstream homeowners already flood in heavy rain. Flood study approval remains an unmet plat condition, and the County Final Plat does not resolve these concerns through an approved drainage/flood study. Draft terms that would have frozen City drainage oversight and shifted maintenance to a developer-controlled MUD made this worse, not better.

  • Flood study approval is among the County’s unmet plat conditions. Per the County’s own memo, the site drains west to east into the FEMA floodplain of Maxwell Creek and on toward Lake Ray Hubbard; approximately one-third of the drainage flows toward Dublin Creek.
  • Runoff toward Maxwell Creek, Dublin Creek, Cottonwood Creek, and downstream properties has not been resolved by an approved drainage/flood study based on the County Final Plat. No independent hydrology or drainage study has validated the developer’s plans.
  • Dated photos, videos, and records of existing flooding are valuable evidence — submit them via the Action Center.
03 · Water and wastewater

A permitted sewer plant on Maxwell Creek — now in court

TCEQ granted a permit allowing an on-site wastewater treatment plant (WWTP) to discharge up to 200,000 gallons per day of treated effluent into Maxwell Creek, which runs through the center of Murphy and drains downstream toward Dublin Creek and Cottonwood Creek. That permit is under challenge in Travis County District Court. Experts retained by the community have testified about risks to the creeks, wildlife, water sources, and nearby neighborhoods, including nuisance odors. Water would come from proposed groundwater wells; the developer’s groundwater availability certification is under review by the North Texas Groundwater Conservation District, and permits from that district and TCEQ are required before construction. Water/CCN service-area questions also remain open. Parker’s alternative framework — City-provided water and sewer with no plant — exists only in principle, with nothing executed.

  • The wastewater permit is granted but remains the subject of active litigation.
  • Parker and Murphy are not opposed to compatible development that needs no sewer plant or MUD.
04 · Changing plans and transparency

666, 693, 624, 170 — which project is this?

The concern is not just the number of homes: different public documents describe different versions of the project, with different unit counts, land-use assumptions, access assumptions, and infrastructure impacts. The developer’s own traffic study evaluated 693 units including multifamily, and Parker P&Z declined a proposal in February 2026. Questions posed directly by City Council — including which properties a MUD would use eminent domain powers on — went unanswered in public.

  • See the side-by-side version comparison.
  • Our position: only a fully signed, binding, enforceable agreement with independent review counts. Presentations and “alignment in principle” do not.

05 · Gregory Lane, private property, and for utilities

Gregory Lane, Private Property, and for utilities

The Gregory Lane lawsuit was nonsuited in April 2026, but the underlying record question stands: Collin County Engineering has confirmed it has no records showing Gregory Lane as a county road, and a law-firm review of the deeds, plats, and recorded documents found no legal documentation that Gregory Lane was ever formally dedicated and accepted as a public road. Right-of-way and utility easements exist in portions of the area — but easements do not make a road a publicly dedicated street, and the County’s GIS map is not a legal record of ownership or dedication. Meanwhile, a MUD would retain condemnation powers inside Parker for utilities and drainage protections.

Affected owner? See “If you are directly affected” in the Action Center before signing anything.

Informed neighbors are the strongest evidence.