The fight for public safety isn't over.

A conditionally approved plat is not a finished project. The Restore the Grasslands / Collin County MUD No. 7 high-density development still faces unmet county conditions, unsigned city negotiations, a six-year-old MUD application, and a proposed wastewater treatment plant (WWTP) whose discharge permit is under court challenge — with flooding, drainage, and public-safety impacts along Maxwell Creek, Dublin Creek, and Cottonwood Creek.

6 yrscommunity opposition (MUD filed March 2020)

60+parties in the contested case
501(c)(3)nonprofit
0agreements executed by Parker
Maxwell Creek · Parker & Murphy
666TCEQ / MUD materials
693traffic study
624County plat
170Parker framework
?actual plan
Four official sources. Four different unit counts. See the comparison below.
Current status · July 2026

Ten open items. Zero resolved.

On June 22, 2026, Collin County Commissioners voted 3–1 to conditionally approve a final plat for roughly 624 single-family lots. That vote resolved nothing on its own — the conditions attached to it remain unmet, the City of Parker has executed no agreement, the MUD is still not approved after six years, and the wastewater treatment plant (WWTP) permit is under court challenge.
Conditional
County plat

Approved 3–1 — with strings attached

Conditions before construction include: the MUD must become a legal entity; Parker and TxDOT must approve the entrance; groundwater permits (North Texas Groundwater Conservation District and TCEQ) must be obtained; the wastewater legal case must be resolved; the flood study must be approved; and other technical approvals must be completed. The plat still shows only one point of access.

In negotiation
City of Parker

Alignment "in principle" — nothing signed

Parker reports agreement in principle on a majority of its Key Issues and has floated a 170-home framework with City water and sewer — but has executed no documents. Its March 2026 conditional approval of the preliminary plat for the FM 2551 connection was ministerial under Texas law, with stipulations, and is not an endorsement of the development or the single entrance.

Contested
TCEQ / SOAH — MUD

Still no MUD after six years

The MUD creation petition, first filed in March 2020, remains in contested proceedings with 60+ parties. Residents and the City of Parker hold party status. Without a MUD, the financing and sewer-plant model collapses.

Contested
Wastewater (WWTP)

Permit granted — and challenged in court

TCEQ permitted a proposed on-site wastewater treatment plant (WWTP) to discharge up to 200,000 gallons/day of treated effluent into Maxwell Creek. That permit is under challenge in Travis County District Court.

Contested
Fire & EMS

One road in, one road out

The County accepts a single access point only by treating the plat as all single-family with sprinklers in every home. The Fire Marshal confirmed buildings with four or more dwelling units would trigger a two-entrance requirement — and the developer’s own traffic study evaluated 309 multifamily units in 11 buildings. Our position: 600+ homes need two entrances regardless of sprinklers.

Pending
Flooding & drainage

Flood study still owed

Flood study approval remains an unmet plat condition. Runoff toward Maxwell Creek, Dublin Creek, Cottonwood Creek, and downstream properties has not been resolved by an approved drainage/flood study based on the County Final Plat. The site drains to the FEMA floodplain of Maxwell Creek and on toward Lake Ray Hubbard, with approximately one-third of the drainage flowing toward Dublin Creek.

Pending
Groundwater

Water supply unproven

Water would come from proposed groundwater wells. The developer’s groundwater availability certification is under review by the North Texas Groundwater Conservation District, permits from that district and TCEQ are required before construction, and water/CCN service questions remain open.

Pending
TxDOT

No driveway permit yet

A TxDOT driveway permit is an unmet condition of the County’s plat approval. State-road access and traffic impacts remain under review.

Unresolved
Gregory Lane

No recorded public-road dedication — eminent domain exposure

The Gregory Lane lawsuit was nonsuited in April 2026 — but the underlying question stands: County Engineering has no records of Gregory Lane as a county road, and a legal review found no recorded documentation that it was ever formally dedicated and accepted as a public road. Easements and right-of-way are not the same. Eminent-domain exposure for nearby private-property owners remains.

Bottom line: a conditional plat is not a finished project, and alignment “in principle” is not a signed agreement. Pending lawsuits and protests remain the community’s leverage to secure enforceable protections.
Tax-deductible donation
Why the numbers keep changing

One project, four versions

The concern is not just the number of homes. The concern is that different public documents describe different versions of the project, with different unit counts, land-use assumptions, access assumptions, and infrastructure impacts.
← Swipe the table sideways to see every column →
Source / Version Development description Why it matters
Original / TCEQ MUD materials Approximately 666 homes / units tied to the proposed Collin County MUD No. 7 and wastewater treatment plant (WWTP) This is the basis of the pending TCEQ contested case history, now with 60+ parties.
Traffic Impact Analysis reports 693 total units: 384 single-family homes and 309 multifamily units in 11 buildings The traffic analysis appears to evaluate a higher-density plan than other versions presented to the public or local governments. It also raises questions about access, emergency response, fire-code classification, and whether later plans materially changed.
Parker negotiation update Parker publicly referenced a possible path toward 170 detached single-family homes if major issues were resolved This is not the same as the higher-density TIA or County final plat materials and should not be confused with final approval.
Collin County final plat materials 624 residential lots on approximately 100 acres, with MUD-owned roads and utilities This is the version conditionally approved by Collin County, but significant issues remain regarding Parker approval, TxDOT access, water/CCN, wastewater, groundwater, flood study, emergency access, and traffic safety.
Earlier interim versions — including a 254-home draft agreement presented in 2025 (never signed) and a lot proposal declined by Parker P&Z in February 2026 — are recorded on the Timeline. Source documents for each version are collected in Documents.
Upcoming dates

What to watch

Schedules shift fast — and items can appear on consent agendas with little notice, as happened in June 2026. Confirmed dates post here; past events move to the Timeline.
TCEQ / SOAH · MUD case

Contested case hearing

Date to be confirmed. SOAH Docket 582-23-01498 · TCEQ Docket 2022-0533-DIS. 60+ parties. Participation details posted when noticed.

Travis County District Court

Wastewater (WWTP) permit challenge

Next deadline to be confirmed. Briefing schedule updates will be posted here as they are set.

City & County agendas

Parker–RTG negotiations & plat conditions

Ongoing. No documents executed; plat conditions unmet. We flag related agenda items by email the moment they post.